Search "Sundays in Spain"

Sunday, December 19, 2010

Decorating for Christmas

It's hard to decorate for Christmas when you have two masons with all their equipment building an arch in the main downstairs area of your house. Before the arch came there was an incongruous plywood board at the top of the wall in the ten-inch deep passageway between the dining room and living room. Painted a brownish orange color, the board extended about a foot in each direction beyond the five-foot wide passage and was about ten inches in height. The same construction appeared on the "other" side of the passage; that is, you could see it from both the living room and the dining room. It was boxed in at the bottom. Maybe it was meant to look like a rough natural timber in a timbered ceiling. It didn't. Nor did it serve any functional purpose, we were convinced, as it sounded hollow when we knocked on wood.

We investigated other houses in our neighborhood and they all had such a structure. The aesthetics didn't seem to bother anyone we talked with. Some houses had a wallpaper border at the top of the wall, just below the ceiling, leading to and from this construction, and that made it look less out of place. Probably our living and dining rooms had had the same trim when first constructed, but any remnants of a border were long gone, and our walls were a clean, cream-colored "drop" paint finish from floor to ceiling.

In late fall our holiday-only neighbors had some construction work done on their basement, and they asked us to observe the process and report by email, as the builder could only do the work while the owners were scheduled to be at home in England. That was how we found our master builder, an immigrant from Bulgaria. It turns out that he has worked on an awful lot of the houses in our neighborhood in the ten years since they were first built and since he has been in Spain.

Christo assured us that the passageway box was empty, not load-bearing, and he liked the design that Johannes had planned for replacement: a curved archway built of and supported by brick. He could do the work any time, but we had house guests in November and early December. So that is how it came to be that only ten days before Christmas, instead of arranging Christmas decorations, we were draping plastic over the chairs and television in the living room, removing bookcases, tables, and lamps, and generally making a mess. The displaced furniture had to go somewhere, and the men had to have space in which to work, so that pretty much rendered the dining room useless. They came at 9:00 Thursday morning, removed the old structure, and placed the brickwork on either side of the doorway. Friday they built the temporary white support for the top arch, and put in the arch itself. The whole thing needs to dry over the weekend, and Friday evening we carefully uncovered two chairs and two small tables so we can sit in the living room and enjoy some weekend television, a glass of wine, and the gas fire, which we need for warmth.

Tomorrow they are supposed to show up to do the final mortar work between the bricks, "drop" paint the wall area above the archway, remove the three steel rods and white plywood that currently are holding up the top bricks, and clean up. I think it's more than a one-day job. I figure that by Wednesday, the 22d, I'll be able to get my Christmas decorations in order in those two rooms. I'm scouting around for an archangel.

No comments: